Indian Railways Allocates ₹238 Crore for Jammu-Katra Route Safety Enhancements
Railways to boost safety on Jammu-Katra route with Rs 238 crore plan

Image: Asianet Newsable
Indian Railways has approved a ₹238 crore (approximately $28.7 million USD) plan to enhance safety on the Jammu-Shri Mata Vaishno Devi Katra route. The project includes slope stabilization, tunnel rehabilitation, and bridge protection to address engineering challenges posed by difficult terrain and adverse weather, ensuring safer travel for millions annually.
- 01The approved ₹238 crore plan focuses on slope stabilization, tunnel rehabilitation, and bridge protection along the Jammu-Katra route.
- 02Railways Minister Ashwini Vaishnaw emphasized the government's commitment to safe connectivity in challenging terrains.
- 03The Jammu-Katra section has faced operational challenges due to adverse geological conditions and weather events.
- 04The project aims to enhance the resilience of the existing infrastructure, improving safety for millions of travelers each year.
- 05In addition, a separate ₹962 crore project for the Kiul-Jhajha 3rd Line aims to improve capacity on the high-density Howrah-Delhi corridor.
Advertisement
In-Article Ad
Indian Railways has sanctioned a significant ₹238 crore (approximately $28.7 million USD) investment to enhance safety on the Jammu-Shri Mata Vaishno Devi Katra route. This initiative includes crucial slope stabilization, tunnel rehabilitation, and bridge protection works designed to address the engineering challenges posed by the region's difficult terrain and adverse weather conditions. Railways Minister Ashwini Vaishnaw stated that these enhancements reflect the government's commitment to ensuring safe and reliable connectivity in challenging environments. The Jammu-Katra section has been historically affected by geological issues, but with these new safety measures, the route is expected to become more resilient, ultimately serving millions of passengers with increased safety and confidence.
Additionally, Indian Railways has also approved the Kiul-Jhajha 3rd Line Project, which involves a ₹962 crore investment aimed at improving capacity on the high-density Howrah-Delhi corridor. This project will facilitate smoother movement of both passenger and freight trains, supporting industrial growth and enhancing trade connectivity across Northern and Eastern India. The new line is essential as the existing double line is operating beyond optimal capacity, with traffic demand expected to rise further in the coming years.
Advertisement
In-Article Ad
The safety enhancements will significantly improve travel safety for millions of passengers using the Jammu-Katra route, addressing previous engineering challenges.
Advertisement
In-Article Ad
Reader Poll
Do you support increased investment in railway safety and infrastructure?
Connecting to poll...
More about Indian Railways
Read the original article
Visit the source for the complete story.






