Tamil Nadu Energy Minister Confirms No Decision on Smart Meter Project Yet
T.N. government yet to decide on smart meter, says Energy Minister Nirmalkumar
Image: The Hindu
The Tamil Nadu government has not yet made a decision regarding the smart meter project, according to Energy Minister R. Nirmalkumar. A comprehensive study on its feasibility is underway, focusing on technology performance and investment requirements.
- 01Energy Minister R. Nirmalkumar confirmed that no decision has been made on the smart meter project.
- 02The project requires significant investment and is under comprehensive feasibility study.
- 03Surveys are being conducted for the installation of smart meters in government buildings as per Central government guidelines.
- 04Over one lakh smart meters installed in T. Nagar, Chennai, are being analyzed for performance.
- 05The government is studying implementations of smart meters in other states and countries.
Advertisement
In-Article Ad
The Tamil Nadu government has yet to decide on the implementation of the smart meter project, as stated by R. Nirmalkumar, the Minister for Energy Resources and Law. During a press interaction in Madurai, he addressed concerns stemming from media reports suggesting the project might be abandoned. Nirmalkumar emphasized the substantial investment required for the project and noted that a thorough study is being conducted to evaluate its technical and economic viability. This includes assessing whether the modem and SIM card technology used in smart meters would function effectively in all areas, particularly in regions with low signal strength. As part of the first phase, surveys are being conducted for the installation of smart meters in government buildings, in line with Central government guidelines. Additionally, the performance of over one lakh smart meters already installed in T. Nagar, Chennai, is currently under analysis. The minister also mentioned that the government is looking into how the project is being executed in other states and countries, with a final decision pending approval from the Chief Minister.
Advertisement
In-Article Ad
The decision on the smart meter project could significantly affect electricity management and billing for residents in Tamil Nadu.
Advertisement
In-Article Ad
Reader Poll
What do you think about the implementation of smart meters in Tamil Nadu?
Connecting to poll...
Read the original article
Visit the source for the complete story.



